Peter Baumgartner wrote: > > Dear Eclipse people, > > Eclipse seems to have problems with large terms. I isolated the > problem as described below. Dear Peter, thanks for you report. An immediate workaround is to move the problematic term from the head to the body of the clause, e.g. eq(X,X). crash_term(X) :- eq(X, <the big term> ). Best regards, -- Joachim Schimpf / phone: +44 20 7594 8187 IC-Parc, Imperial College / mailto:J.Schimpf@ic.ac.uk London SW7 2AZ, UK / http://www.icparc.ic.ac.uk/eclipseReceived on Wed Mar 21 12:11:00 2001
This archive was generated by hypermail 2.1.8 : Wed 16 Nov 2005 06:08:05 PM GMT GMT